Dryer Machine Drying Face Veneer with Mesh Conveyor
The veneers move through the drying machine in several layers along rollers, as the machine's name indicates. The target moisture level after drying is around 6-7% which is precisely the right moisture level for gluing veneer.
A sufficient drying temperature is 145-160ºC and the veneers pass through the machine in about six minutes. Drying conditions and the moisture of the veneers are monitored continuously to make sure that the drying quality remains even.
Usually, the original moisture is 70-80%, after drying, the moisture is about 10%
>>>Parameters:
The dryer machine-mesh dryer, can be different layers, length and width, so we usually offer and produce according to your production capacity required.
Name |
Mesh dryer |
Model |
MH-MD3618 |
Heating mode |
Steam/Oil |
Veneer thickness |
0.3-2mm |
Transport mode |
mesh belt drying mode |
Speed |
Speed adjustable |
Number of layers |
1layer/2 layers/3layers/4layers |
Length of hot wind area |
20m/26m/30m/40m |
Peoduction capacity |
10-20m³/day, 20-30m³/day, more |
Final Moisture of veneer |
10%±2 |
>>>Main Parts:
<1> Resonable design and good parts make mesh dryer save energy and transfer heating fast.
<2> The dryer machine uses the latest ultra-low noise centrifugal ventilator, reduce noise, good for workers.
<3> The wind speed is faster and the air volume is higher, therefore the drying speed is much quicker.
<4> Adopt variable frequency speed control, can adjust feed speed according your veneer thickness and moisture content, to get perfect drying effect.
<5> The mesh is anti-rust, and can drying very thin thickness face veneer.
>>>Veneer drying line at our Clients Factory:
The installation of veneer roller dryer is more complex and spend longer time than others, so our engineer will go to install with your workers.
>>>RFQ:
<1> How long of your machine warranty?
2 years for main parts.
<2> The production time?
1 month.
<3> Payment terms:
T/T. 30% deposit, 70% before delivery.
<4> Will you help me solve when i meet problem about machine?
We will at the fist time reply you and help you solve.
<5> Will you engineer come to install machine?
Yes, when machine soon reach your factory, our engineer will go to your factory.